Lost 3 400 on a steel gate because I bid the steel at last year's priceQuoted 11 200 for a driveway gate last fall. Half inch plate, forged pickets, powder coat. Signed it in September, ordered steel in January, and the plate had gone up enough that the material line alone ate 3 400 more than I wrote down. I honored the number because that's what a quote is. But I've been bidding off a price sheet I hadn't updated since the spring before. Point is I don't think most of us lose money on the labor. We lose it on the parts we buy. I know my hours better than I know what a length of angle costs this month. Raised my material markup to 25 percent and I still flinch every time I say it out loud to a client.
commissionsmetalworkpricing
Raised my steel gate price to €1,600 and the first thing I heard was "but the raw material is only €400."Custom steel gate, welded and hung last month. Charged €1,600. Client's friend looks at the metal and says, "well the steel's only about €400 of that." Yeah. And the 60 hours of welding, fitting, and the trip back to fix a hinge I didn't get square the first time, that's the other €1,200. I don't know when people started thinking the price of a thing is the price of the stuff in it. Nobody says that about a mechanic's labor or a plumber's callout. But a gate, everyone's an expert on what steel costs at the yard. Used to charge €1,100 for the same gate and I'd eat the mistakes myself. The hinge redo alone was a day of my life. Nobody ever thanked me for the free day. Went up to €1,600 this year and I've been second-guessing it ever since. Then that comment came and I realized I'm still too cheap. The raw material being €400 is exactly the point. If I only charged for material I'd be a scrapyard.
commissioncustom-metalworkpricing
Welded a 9 foot gate for a contractor. Charged 4,800. The steel alone ate 1,900.Steel prices have gone stupid. Last gate I did this size, the stock ran me about 1,100. That was four years ago. So the quote came out at 4,800 and I said it out loud to the guy and heard how it sounded. He didn't blink. Signed the deposit same day. Which tells me I was still low. The part nobody wants to count: 60 hours in the shop. Consumables, gas, grinding discs, the argon refill, the two trips to the yard because I miscalculated the first time. Finishing. Renting the trailer to deliver it. I did the math after and it's about 28 an hour before I take anything for the shop, the welder, or the twenty some years it took to be able to hang a gate that doesn't sag in ten years. 28 an hour is what a guy with a truck and a helper gets. I'm not complaining about the number. I'm saying I set it by adding up steel and doubling, which is a habit from when steel was cheap. If your material is half the job, doubling doesn't cover you. You need to price the hours like they cost something, and I keep not doing it. Raised it to 5,600 for the next one. Still haven't sent that quote.
fabricationpricingwelding
Charged a museum shop €2,200 for a welded steel piece. Took me six weeks and I ate the material costs.Quoted a museum shop €2,200 for a welded steel piece, thinking I'd build in some cushion. Took six weeks. Then I added up the steel, the oxygen, the acetylene, the grinding discs, the days I stood there deciding not to add one more curve and redid a joint that was already fine. Came out to about €11 an hour before tax. The shop sold it in a month. Marked up to €4,800. That part's on me, I set the number. But I keep thinking about the steel supplier who charged me more for the material than I'd budgeted and I just paid it, didn't even blink. Meanwhile I'll haggle with myself over my own labor for a week. I've been at this thirty years and I still price like I'm twenty-six and grateful for the work. Raising the next quote twenty percent regardless of what it costs me to say it out loud.
commissionpricingsculpture
Just did the math on a welded steel piece I finished last month and I'm not sure what I'm doing wrongSold a piece last month. 4 feet tall, welded steel plate, took me about 90 hours counting design and grinding and the finish. I charged $3,800. Buyer was happy. I should be happy. But I broke it down after. Material was $620 in steel and welding gas. Gallery takes 40%. So I cleared about $1,660 for those 90 hours. Thats $18.44 an hour before taxes. I know guys who frame houses for $35 an hour cash. My nephew does HVAC and clears six figures. I'm not saying I want to do HVAC. But I've been at this 30 years and I still cant figure out how to charge what the work is actually worth without pricing myself out of the market. The gallery tells me $3,800 is already pushing it for a sculptor nobody's heard of outside the region. I look at that hourly rate and it feels like I'm working backwards.
galleriespricingsculpture
Welded steel base for a large bronze.Just finished the fabrication on a welded steel base for a bronze sculpture that's over seven feet tall. It's about 1500 pounds of mild steel, mostly 4-inch square tube. Had to build a custom jig to get the angles right. The welding is all done, now it's just grinding and prepping for patina. Feels good to get this beast off the floor. It fought me the whole way.
fabricationsteelwelding
Quoted 4,800 for a steel garden gate. Then I counted the hours.I don't do a lot of gates. Forge work, small stuff, brackets and railings. But a neighbor down the road wanted a gate for the side of his house and asked what I'd charge. I said 4,800 and thought that was fair money. Steel was 900. That's the cut sheet, tube and flat bar, one delivery. Then I stood in the shop for six days. Cutting, fitting, tacking, squaring, correcting the square because the frame pulled, welding it out, grinding, wire brushing, two coats of primer and a topcoat, letting it cure, then hauling it over in the truck and hanging it with two of us because it's a heavy bastard and the posts weren't plumb to begin with. Six days at the bench plus a day of finishing and a half day hanging, and I was in it about 2,600 in materials and consumables. So call it 2,200 for eight days of my life before anybody takes a bite. That's under 300 a day for work that will still be standing when I'm not. I knew the number was soft when I said it out loud. I said it anyway because he's a neighbor and because I'm still figuring out what to charge for the things I don't do often. The work I do every week I can price in my sleep. The work I do twice a year, I guess, and I guess low. It's hung. It's straight. He's happy. I learned what a gate costs me, and it's not 4,800.
commissionpricingsteel
Quoted $4,500 for a welded steel gate, took six weeks, netted about $11 an hourA client came to me two years ago wanting a welded steel gate for their property. Custom, so I quoted $4,500. I had done the material math, figured my hours at a rate I thought was fair. Then the design kept changing, which it always does. I added the scrollwork because they asked for it, went back and rebuilt the hinge mounts twice because the masonry turned out to be garbage. Six weeks door to door. When I actually added up the hours, including the redo, it came to about $11 an hour. I could make more welding pipe for a plumber. I don't know what the answer is. You raise the quote and clients balk, or you stay honest about hours and you're priced out. I just know I stopped quoting a flat number without writing down how long I genuinely expect it to take. That gate taught me the lesson, $11 at a time.
commissionpricingsculpture
The thing nobody tells you about welding galvanized steelBeen meaning to say this for a while. If you're welding galvanized steel in your studio without proper ventilation, stop. The zinc oxide fumes will give you something called metal fume fever. Feels like the worst flu of your life for about 24 hours. I got it once in my twenties working on a stair railing in a garage with the door half open. Thought I was dying. Called my father thinking it was a heart attack. He told me to drink milk and go to sleep. Actually worked, but I wouldn't recommend the experience. Wear a respirator. Not a dust mask. A proper respirator with the right cartridges. Or grind the galvanization off the weld area first. Takes an extra ten minutes and saves you a day of shaking on the bathroom floor. That's all. Just something nobody warned me about and I keep seeing people skip.
sculpturestudio safetywelding
Quoted $9,500 for a steel railing. Then spent $2,100 at the yard and ate it myself.Did a forged and welded stair rail last spring. Twelve feet, fourteen balusters, hand-scrolled top and bottom. Quoted $9,500 installed. Client never blinked, which should have told me something. Steel went up between the quote and the buy. Not a little. The tube alone came in at $2,100 when I'd figured $1,300. I have a habit of not putting an escalation clause in the small jobs because I think it makes me look like a shyster. So I ate $800 out of my own pocket and told nobody. What actually chewed the job was the finish. They wanted a waxed black, and the wax has to go on warm in a ventilated space, so that's a full extra day with the shop doors open in March, torches running. I don't bill days like that. I bill the piece. That's the mistake. The piece is the easy part. The day after is what's expensive. The honest number was closer to $11,000. I'd have been paid it. They had the money and they liked the work. I'm 61 and I've been doing this thirty-plus years and I still undercharge on anything with a finish schedule, because in my head the finish is just "the last thing." It isn't. It's half the labor and it's the half that fails if you rush it. The rail is still dead straight two winters on, so I got that part right.
commissionsmetalworkpricing
The delivery guy asked if my steel could be recycled at the curbUnloading a 400-pound welded piece off the truck today and the delivery driver nods at it and says, "You know the city takes scrap metal on Tuesdays." I just stood there holding my end of it. Wasn't even mad. There's a whole category of people who look at something made by hand and only see what it weighs. Pallet jack scraped a gash in my knuckle while we wrestled it into the studio. Cleaned it with turpentine because that's what was in reach. Probably should have used soap. Anyway. Piece is in place. It'll outlive the guy who asked about the curb. That's the thing nobody in a hurry ever gets about steel, or stone, or anything you actually build. It doesn't care if you were in a rush.
craft vs commoditysteelstudio life
The 30-year-old steel I welded still outlives the gallery that showed itWent past the old site today. The place that used to be a gallery showing my early steel pieces, the ones I welded in a rented shed with a busted MIG gun. Building's a vape shop now. That's fine. Those pieces are still standing in someone's yard in New Jersey, one of them is a handrail in a courthouse in Scranton. Keep finding the same thing after thirty years. The work that outlives the conversation around it is the work that was made to hold weight, not to hold a concept. Nobody asks about the courthouse handrail. It just does its job. Stripped the rust off a piece from '92 this morning. Two hours with a wire brush and it's ready to live another thirty years. That's the whole thing, really. Make it so it outlasts the people who talk about it.
longevitysteelwelding
The client asked if I could make it "go viral"Got a call this week from a guy who wanted a steel piece for his office lobby. Fine. Then he asks if I can make it "go viral." I thought he was joking. He wasn't. Said his marketing guy told him everything should have a hook now. I told him the only hook in my shop is the one that holds the chain block up. He didn't laugh. We're at the point where people want the sculpture to do the advertising instead of the other way around. The piece is 400 pounds of welded steel. It doesn't need to trend. It needs to hold up for forty years and not look like it was built last Tuesday. That's the job. He still placed the order. We'll see what he says when I send the progress photos and they're just, you know, photos of steel.
clientscraft-vs-trendsteel
Spent 3 weeks on a welded piece and charged 2 800. Then I added up the argon.Finished a welded steel piece in March. Roughly 5 feet, forged base, took me the better part of three weeks with a couple of days lost waiting on a shear at the yard. Quoted 2 800 like it was still 2019 in my head. Then I did the paperwork, which I should have done before I opened my mouth. Steel came to 640. Argon, discs, gas for the torch, a new set of tips, about 210. Yard delivery 85 because I can't lift that stock alone anymore and I'm not pretending otherwise. Shop electric for the welder and the compressor ran me maybe 90 for that stretch. That's 1 025 in materials and consumables before I've touched a tool. So 1 775 for three weeks. I also pay 400 a month on the shop. Do the rest yourself. The part that stings isn't the number, it's that I knew better. I've been doing this thirty years. I priced it off what a piece that size used to go for and never once looked at what the stock actually costs me now. Steel's up and I'm still quoting like a kid who's just happy to be in the room. Raised my quote sheet by 20 percent after that. Lost a quote last week over it. Fine.
materialspricingwelding
Drove to the yard for 3/8 plate and came home with a $340 receipt and no steelNew guy at the counter looked at my cut list for about four seconds and said "we don't do that anymore." Doesn't do what. Selling metal, apparently, unless you buy the whole sheet. I've been going there twenty two years. Used to be Ray would walk the rack with me and we'd argue about a quarter inch. Now I get a laminated sheet with three grades on it and a guy who calls plate "sheet." Left without anything. I've got a piece sitting half tacked on the bench with a gap I need to close and no stock to close it with, so the whole week is on hold. If anyone in the area knows a yard that still sells drops and will cut to a drawing, I'd hear it. Otherwise I'm driving an hour Tuesday.
fabricationsteelsuppliers
Steel base plate I welded warped on me. Fixed it the dumb old way instead of starting over.Chased a weld on a 3/4" base plate last week. Pulled the whole thing out of square by about a quarter inch over three feet. My first thought was to cut it and start fresh, which is what most people would do now. Instead I did it the way my old mentor would have. Laid it flat, worked the high side with a torch and a hammer, checked it against a straightedge about fifty times over two days. Slow, boring, unphotogenic work. It's square now. I keep telling younger guys that knowing when to stop is the whole game. Turns out knowing when not to start over is the other half. The plate has a story on it now, and it'll hold. Some things are worth the boring fix.
fabricationsteelweld
I quoted 1,800 for a steel railing and the shop down the road did it for 900Client sent me photos of the finished job last week. Nine hundred euros, powder coated, installed. I went and looked at it because I am that kind of fool. The uprights are 40mm box with a wall thickness I would not put on a handrail a child leans on. Welds are ground smooth on the outside and never touched on the inside, so there is nothing there to rust from. Give it two winters on a coastal street and I know what it will look like. Nobody asked me. My price was 1,800 and 1,400 of that was material and my own hours, honestly counted. I cannot get under it without lying to myself about the time. The part that sticks is that the client was polite about it. Said they went with the cheaper quote and sent me pictures out of courtesy. Fine. That is how it works and I have no argument with them. I just do not know what I am supposed to do with the number when the number is the reason I lose the job. Dropping to 1,200 does not make the railing cheaper to make. It makes me slower and worse.
commissionspricingsteel
the steel yard changed owners and now the kid measures by the piece, not the footSix lengths of 3/8 rod, they rang it up as six separate items and charged me cutting time on top. I cut it myself. I was standing right there with the grinder and the kid watched me do it. Twenty two years I've been going to that yard and the old man knew my truck. Now there's a tablet and a loyalty card and a guy in a polo shirt asking me what I'm building. I said a gate. He wanted to know if it was "for a project." I said it's for a gate. Cost me $61 more than last month for the same order. I paid it because I needed to get back to the shop, but I'm going to start driving out to the place in Fallbrook. Forty minutes each way. Cheaper and they leave you alone. Anyway. If anyone in the area knows a yard that still sells off the rack and lets you walk the aisles, say so.
pricingsteelsuppliers
I charged $400 for a welded steel sculpture that took three weeksA gallery reached out last year about a piece I had in a group show. Wanted to know my price for a commission in that range. I said $400. They said great, we'll list it at $1800. That's when it hit me. I wasn't pricing my work, I was pricing my materials and time like I was still doing fabrication for other people. I'd welded it myself, designed it, sandblasted it, patinated it, figured out the base so it wouldn't tip in wind. Three weeks start to finish. $400. I told my daughter about it and she just stared at me. She said dad you're not a contractor. She was right. I raised my studio rate after that but I still catch myself lowballing. There's a voice in my head that says who's going to pay that for something you made. Thirty years in and it's still there.
commissionpricingsculpture
The steel I ordered that showed up wrong and I cut it anywayOrdered 1/4 inch plate from the supplier, got 1/8. I saw the thickness the second I lifted it off the truck. Called them, they offered to swap it, freight both ways, two weeks. So I cut it anyway and changed the whole piece. The design was never that precious. Now it's a lot lighter, thinner profile, and I had to rework every joint because you can't weld 1/8 like quarter plate without blowing right through it. Took three days to figure out the heat. Came out better than what I drew. That's usually how it goes. The mistake is the real commission. You just have to stop fighting it and let the material tell you what it wants to be.
processsculpturesteel